Wednesday, November 24, 2010
Edging and mulch
Finally finished the fourth edge on the croquet lawn. Got the wood edging in place and a brick insert for moving the mower. Mulched the area between the lawn and the perennial bed with 3 bales of pinestraw and a 4th bale for the Abelia area.
Tuesday, November 23, 2010
Herbicide
1 gallon of Roundup along the golf course edge starting at the Loquat and going to the other end and then back along the pool fence to the Cyrilla. Also included the strip between the croquet lawn and the perennial bed.
Sunday, November 21, 2010
Mulch
Mulched and hand weeded the island bed in front and the turret bed. Used 3 bales of pine straw. Built a pine straw barrier 2 high with 8 bales total for the Clemson Bottlebrush.
Friday, November 19, 2010
Friday, November 12, 2010
Wednesday, November 10, 2010
Replanting Kalmia
After considering the lack of roots when I replanted the Kalmia on Monday, I decided to replant it in the front where I think the drainage is better. I think it will take the sun if the roots are healthy and the problems it was having stemed from the very heavy soil.
Monday, November 08, 2010
Planting
Planted the Peacock Camellia by the garage wall where the Japanese Maple was and the Fishtail Camellia between the Smoke Tree and the Chinaberry. Transplanted the Kalmia to a more shady location. Replaced it with Willowwood Kalmia. Planted the Hedgehog Juncus by the fountain. Planted the Bride Pearlbush in the front.
Saturday, November 06, 2010
Cuttings
Took cuttings from the Sunny Side Up Lantana, Variegated Mexican Sage and potted up the Salvia Mesa for the Winter.
Subscribe to:
Posts (Atom)